The project is located in Tekesi County, Ili Prefecture, Xinjiang. It is a newly built large-scale mining, beneficiation, and metallurgy project with an annual ore processing capacity of 9.8 million tons. In the gold extraction process, heap leaching is adopted. After spraying, the solution containing dissolved gold (Au) is referred to as the “pregnant solution” . To recover gold from the pregnant solution, it must be transported steadily and efficiently from the pregnant solution pond in the heap leaching area to the downstream gold recovery processing plant.
The conveyed medium is a high-value, highly corrosive alkaline solution, which places stringent requirements on the pump’s performance, reliability, and corrosion resistance. Therefore, a vertical long-shaft pump suitable for this operating condition was selected as the core conveying equipment.